A Case Study Analysis of the Overhead Rate Impact Model Used During the C-5 Maintenance Source Selection - Prijzen

The Overhead Rate Impact (ORI) model was used during the C-5 Maintenance source selection to evaluate the impact the new workload would have on the existing overhead rates. The objectives of this research study were to evaluate the ORI model and to identify the lessons learned from this source selection. To accomplish these objectives, interviews were conducted with members of the source selection team who were on the Cost Integrated Product Team...

De A Case Study Analysis of the Overhead Rate Impact Model Used During the C-5 Maintenance Source Selection is een populaire optie voor Onderwijs & Didactiek. Esy heeft 1 prijs gevonden, de goedkoopste keuze is volgens ons Bol, maar bekijk de andere aanbieders om het zeker te weten. Links openen in een nieuwe tabblad. Bekijk hier onder de product specificaties. Meer product informatie beschikbaar bij Bol.

Productspecificaties

Waar te koop

A Case Study Analysis of the Overhead Rate Impact Model Used During the C-5 Maintenance Source Selection is onder andere te koop bij: Bol. Esy raadt altijd aan om meerdere aanbieders te bekijken om geen last minute deals mis te lopen.

A Case Study Analysis of the Overhead Rate Impact Model Used During the C-5 Maintenance Source Selection
meer afbeeldingen
  • EAN9781288306015
38.052.468producten
137.079merken
917winkels